Project Status: Completed

Mr. Toad’s Trail Maintenance

Between 2011 and 2018 TAMBA held multiple volunteer trail days to rebuild portions of this iconic trail formally known as Saxon Creek.
In 2016, TAMBA hired ACE crews to perform major rock work armoring sandy turns, repairing eroded sections of trail, and restoring wide trail segments
to their original singletrack character to “Keep Toads Wild.”

 

Funds raised from TAMBA events were used to complete this work.

Below are some before and after pictures of the work done.

Before - widened trail After - After – armoring and narrowing drainage

The left image shows a wide, sandy trail. The right image is after armoring and narrowing the trail.


toads-2-before-and-after

The left image shows a wide, sandy turn. The right image is after armoring and narrowing.


The image on the left is a sandy, rutted section of Toad's rock garden. The image on the right is after armoring.

The left image shows a rutted section in Toad’s rock garden. The right image is after armoring.


The image on the left show two side-by-side trails. The image on the right is after narrowing and ensuring drainage.

The left image shows a section with two trails. The right image is after narrowing and ensuring drainage.


The image on the left shows a rutted trail. The image on the right is after armoring.

The left images shows a rutted segment of trail. The right image is after armoring.