Overall a lot of good ideas were generated last Saturday June 11th on adding more features and flow to the bottom section of Corral Trail. About 20-30 riders participated throughout the day demonstrating riding techniques on the existing trail and critiquing existing features. The data collected will now be used by Hilride to produce a complete set of construction drawings that can be built from. Features to be included will be new log rides, hip jumps, berms, and a separate jump line on the straight away. Look for more info and trail building dates later this summer.